Factories

Factory Exteriors

Factories 2
Factories 3
Loading the trolley into the kiln
Filling gaps between the kiln and trolley with soil, etc.
Removing joints around 4 days later
Removing carbonized material.
Extinguishing fire by covering.
Extinguishing fire by covering.
Covering with sand and filling the gaps with the ground using sand, etc. [Suffocation].
Removing the covering
Cooling in the open air
Selection of baked charcoal
Automatic packing line (automatic packing lines for charcoal, powder and granules)
Automatic packing line (automatic packing lines for charcoal, powder and granules)
Factories 4
Automatic packing line (automatic packing lines for charcoal, powder and granules)

Other Facilities
Other Facilities
- Other analytics instruments
- Constant temperature and humidity machine
- Small test carbonizing furnace